25 Đường số 27, Khu đô thị Vạn Phúc, Phường Hiệp Bình Phước, Thành phố Thủ Đức, Thành phố Hồ Chí Minh, Việt Nam
+84 0287.30.66.390 Email Us
/ 30/09/2024

Aker Solutions bags Troll A topside modification deal

Norway’s Aker Solutions has been awarded an EPCIC contract by compatriot Equinor to prepare the topside of Troll A for accelerating production from the Troll West gas reservoir. The scope includes engineering, procurement, construction, installation, and commissioning for topside modification. The purpose is to prepare the Troll A platform for receiving and processing gas from …

Author:

Leave A Comment

error: Content is protected !!